Sports Complex Development
Projects Completed

Sports Complex Development

A planned multi-sport facility at Saint Joseph's College Sasse to provide students with modern sporting infrastructure and promote physical education and athletic achievement.

Project Vision

The Sports Complex Development Project represents the most ambitious infrastructure initiative ever undertaken by SOBA BMC. Announced at the 2024 Annual General Meeting, the project envisions the construction of a modern multi-sport complex on the Saint Joseph's College Sasse campus, providing students and the wider community with world-class sporting facilities.

Planned Facilities

  • Full-size football pitch with flood lights

  • Basketball court and volleyball court

  • 400-metre athletics track

  • Multi-purpose indoor sports hall

  • Changing rooms, showers, and storage facilities

  • Spectator stands with a capacity of 500

Rationale

Saint Joseph's College Sasse has a proud sporting tradition, having produced numerous national and international athletes. However, the college's current sporting infrastructure is severely inadequate for the needs of its growing student population and the development of athletic talent. This project will address that gap decisively.

Budget and Timeline

The project is estimated to cost 65 million FCFA and is expected to take approximately 24 months to complete once construction begins. Fundraising is currently underway, with a major campaign planned for the 2025 SOBA BMC Gala Dinner.

How to Contribute

Members and supporters who wish to contribute to the Sports Complex fund are encouraged to contact the chapter treasurer or make a direct transfer to the designated project account.

Share:

Project Details

Status
Completed
Start Date
01 Jan 2025